Projects

 

our projects

Focus Areas Covered:
Technical Services Used:
River/Watershed:

River Naver Catchment Restoration

cbec led a team to develop a prioritised catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was, through reinstatement of natural geomorphic processes, to._.

Read more

Dowlais Culvert Assessment

cbec undertook work relating to the design of a culvert on the Nant Morlais stream in Dowlais, Merthyr Tydfil. An upgraded access track suitable for the transport of construction machinery._.

Read more

Wooler Bank Stabilisation

cbec was contracted by the Tweed Forum to design measures to stabilise a section of eroding bank on the Wooler Water, Northumberland. The Wooler Water is a highly dynamic gravel-bed._.

Read more


River Wandle Restoration

cbec was contracted by The Wandle Trust in south London to restore a 1.5 km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel._.

Read more

SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)

cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.

Read more

River Otter, Devon

cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.

Read more


River Nar at Pentney

cbec, in conjunction with frog environmental, were contracted by the Norfolk Rivers Trust to design restoration measures for the tidally-influenced end of a chalk stream in north Norfolk. cbec undertook._.

Read more

Ellie Burn Wetland Enhancement

cbec was contracted to develop restoration measures for the wetland around Ellie Burn, Aberdeenshire, with the ultimate aim of assisting in the improvement of the current ‘moderate’ ecological status (as._.

Read more

Eddleston Water Restoration at Cringletie, Lake Wood and Shiphorns

cbec was contracted by Dundee University and the Tweed Forum to provide the joint benefits of improving the ecological status (through river restoration) and natural flood management (NFM) of the._.

Read more


East Tullos Burn Restoration

cbec was contracted by Aberdeen City Council to restore the East Tullos Burn in Torry from a hard‐engineered straightened channel into a more natural stream and associated functional floodplain. An._.

Read more

River Derwent Feasibility Study

  cbec was contracted by Natural England to investigate opportunities available for restoration of the upper River Derwent and Stonethwaite Beck in Borrowdale, Cumbria. A desk-based literature review was followed._.

Read more

Allt Lorgy Restoration

cbec applied a full ‘process restoration’ strategy on a tributary of the River Dulnain, with the aim of reinstating dynamic geomorphic and ecological processes. We identified the dominant constraints to._.

Read more


our projects

Focus Areas Covered
Technical Services Used
River/Watershed

[/wpv-filter-controls]

Butano Creek Floodplain Reconnection and Restoration Design

Channel conditions in the project reach Simulated floodplain inundation for a 2-year event in the existing condition cbec is currently developing designs for a restoration project that will reconnect a._.

Read more

Lower American River – Temperature Refugia, Temperature Monitoring, and On-Call Support

Trimaran setup for temperature mapping Example of temperature mapping cbec has provided temperature and stage monitoring on the Lower American River (LAR) since 2008. In continued support of this effort,._.

Read more

Fremont Weir Alternative 5

10% Grading Plans 10% HEC-RAS Modeling As part of the DWR/USBR Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project EIS/EIR to identify and evaluate alternatives to address fish passage._.

Read more


American River Parkway Cordova Creek Naturalization

Mid-Construction Photo Showing Original Channelized Reach on Right cbec provided restoration/rehabilitation design services for Cordova Creek. Our approach to habitat restoration design and planning included three co-equal goals of the._.

Read more

M&T Chico Ranch / Llano Seco Rancho Fish Screen Facility Long-Term Project – Evaluation of Rock Removal on the Sacramento River

Meander migration model results SRH 2D model output – Velocity and Magnitude for the 100-year event M&T/Llano Seco Pumping Plant and Fish Screen Facility (Facility) provides water to agricultural lands._.

Read more

Moosa Creek Mitigation Bank

Aerial map of watersheds and project areas Existing 100-year flow diagram cbec was recently contracted by Moosa Creek, LLC, who proposes to develop the Moosa Creek Mitigation and Conservation Bank._.

Read more


Advancing the Integration of Vegetation in Floodplain Modeling

cbec collaborated with River Partners and DWR to develop a workshop that explores design concepts and techniques to advance the integration of vegetation in floodplain modeling and management. Vegetation on._.

Read more

Independent External Peer Review (IEPR) of the Sutter Basin Pilot Feasibility Study

cbec was selected to participate on the Independent External Peer Review (IEPR) Panel of the Sutter Basin Pilot Feasibility Study, Sutter Basin, California: Draft Feasibility Report – EIS/EIR, as a._.

Read more

our projects

Focus Areas Covered:
Technical Services Used:
River/Watershed:

Hallingdalselva Habitat Enhancement

In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway. The study reach is impacted._.

Read more