River Wandle Restoration

cbec was contracted by The Wandle Trust in south London to restore a 1.5 km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel re-profiling.

Topographic surveying along the impacted reach provided boundary condition data for 1D/2D coupled hydrodynamic modelling, the output utilised to guide restoration designs and ultimately produced full conceptual and engineering drawings that the Trust used for public consultation and the consenting process. Construction at Hackbridge was completed in October 2014. We completed this project on budget and to the timescale agreed by the client.

Details

Watershed: Wandle
Project:

Technical Services